Sign In | Join Free | My ledscreensign.com
China Sansion Power Electric Co., Ltd. logo
Sansion Power Electric Co., Ltd.
Building A One-stop Service Platform
Verified Supplier

1 Years

Home > Transformer Test System >

Fully Automatic Transformer Comprehensive Test System for Transformer Manufacturers, Power Supply Companies and Maintenance Centers

Sansion Power Electric Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Fully Automatic Transformer Comprehensive Test System for Transformer Manufacturers, Power Supply Companies and Maintenance Centers

Model Number : SXBZ

Safety Performance : Triple overload protection, fault cut-off within 10ms

MOQ : 1 Set

System Structure : Modular Configuration

Delivery Time : 30 Working Days

Brand Name : Sansion

Control Method : Computerized automatic measurement and control

Place of Origin : China

Onboard Instruments : Power analyzer, DC resistance tester, turns ratio tester

Payment Terms : T/T,L/C

Fault Current Disconnection : ≤10 ms

Packaging Details : Plywood Case

Certification : CE/SGS/EMS/ISO 9001

Main Components : Medium-frequency generator, induction voltage regulator, test transformer & cabinets

Contact Now

Product Description

The SXBZ Series Transformer Comprehensive Testing Solution is designed for transformer manufacturers, electrical testing laboratories, maintenance facilities, and power equipment companies that need a coordinated approach to transformer testing. Instead of operating multiple independent instruments for different procedures, the system brings power supply, voltage regulation, measurement, control, protection, and data acquisition into a coordinated testing workflow.

Key Function

  • Comprehensive Electrical Measurement

    The system can integrate voltage, current, power, and other electrical measurement functions required for transformer testing. This provides a centralized way to monitor important testing parameters during operation.

  • Transformer DC Resistance Testing

    The system can be configured with DC resistance testing functions for transformer winding resistance measurement. It is suitable for routine inspection, manufacturing tests, maintenance, and troubleshooting applications.

  • Turns Ratio Measurement

    Turns ratio testing can be incorporated into the system configuration to support transformer winding ratio verification.

  • Centralized Test Control

    Testing operations can be managed through a centralized control interface, helping operators reduce unnecessary switching between different instruments.

  • Test Data Acquisition

    Measurement data can be collected and stored according to the configured testing requirements. This is particularly useful for transformer manufacturers handling repeated testing procedures.

Technical Overview

Item Description
Product Series SXBZ Series
System Type Transformer Comprehensive Testing System
Control Mode Centralized / Computerized Control
System Structure Modular Configuration
Voltage Measurement Configurable
Current Measurement Configurable
Power Measurement Configurable
DC Resistance Test Configurable
Turns Ratio Test Configurable
Data Acquisition Configurable
Protection Three-Level Overload Protection
Fault Current Disconnection ≤10 ms
Application Factory / Laboratory / Maintenance
Customization Available

Typical Applications

  • Power transformer manufacturers
  • Distribution transformer manufacturers
  • Dry-type transformer manufacturers
  • Transformer repair workshops
  • Power utilities
  • Electrical equipment manufacturers
  • High-voltage testing laboratories
  • Transformer inspection centers
  • R&D and engineering laboratories

FAQ

  1. What transformers can be tested with the SXBZ system?

    The system can be configured for different power and distribution transformer applications, including oil-immersed and dry-type transformers.

  2. Is the SXBZ a standard product?

    The SXBZ is a configurable comprehensive testing system. The final configuration depends on the customer's transformer specifications and required test items.

  3. Can existing testing equipment be integrated?

    The system configuration can be discussed according to the customer's existing equipment and testing requirements.

  4. Can the testing process be automated?

    Centralized and computerized control can be configured according to the required level of automation.

  5. Can test data be recorded?

    Yes. Data acquisition and test-result recording functions can be incorporated into the system.

Fully Automatic Transformer Comprehensive Test System for Transformer Manufacturers, Power Supply Companies and Maintenance Centers

Product Tags:

fully automatic transformer test system

      

transformer comprehensive test equipment

      

transformer test system for manufacturers

      
Quality Fully Automatic Transformer Comprehensive Test System for Transformer Manufacturers, Power Supply Companies and Maintenance Centers for sale

Fully Automatic Transformer Comprehensive Test System for Transformer Manufacturers, Power Supply Companies and Maintenance Centers Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Sansion Power Electric Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)